This project was started and completed in the fall of 2010. The customer had a problem with the elevated deck & roof system sagging. We discovered that the posts supporting the outside edge of the roof were rotting at the ground causing the deck & roof to sag. We told the customer that the structure could be jacked up, pour new caissons and install new posts then lowered back into place. The customer decided that included in the project would be a new walk out basement door. We over excavated under the deck, poured footers and supporting walls, installed new support posts, poured a new 15 x 20 slab on the north side of the deck, poured a new slab with a sump system under the deck, constructed a new landing & stair from the deck to the new north slab & constructed a new landing & stair from the new north slab to the lower walk out slab.  