In April of 2006 we partially drained a 20 acre lake to redo the east & south shoreline. TWI managed the project for Wadley Farms. We removed property line fence around the east & south shoreline, removed 4 docks and brought in some large earthmoving equipment to dig the bottom of the lake along the 2 sides. We removed approximately 40,000 yards of dirt which created additional water storage of approximately 25 acre feet of water. We built 3 new docks and repaired 1 on the lake, reinstalled all of the property line fencing and reseeded all of the land. The east & south side of the lake used to be low level swamp ground and now is lake shoreline.